![]() |
Peg's Custom Teardrop Construction begins!! |
| Here's the back of the side panel. Scraps of 'glass reinforce the sections. | ![]() |
![]() |
Here, I have the sides cut out, with the doors and window openings done. Here is a side, propped up for a look. |
| I stuck the window in for a preview.. | ![]() |
![]() |
So, How did I do? I think I got it pretty close!! |
| The wall framing starts out as a bunch of mitered segmants. Here, I've done enough for both sides of the body. | ![]() |
![]() |
One side of the body framing is done. I'll trim it to shape with a router once the glue is set. I describe this method in detail in my ShopManual. |
| Blocking for shelves and bulkheads is installed in this phase. Insulation will fill the voids between the framing. |
![]() |
| Back |
Home | Next |