'Lil Diners One and Two
        Finishing  up  Mike's...


Intro Wall Panels Insulation, Wiring, Floor Bulkheads Roof Galley Diner #1 Finished Diner #2 Differences Diner #2 Final Touches

I got a vent for the propane cabinet from West Marine.
Frank's a/c vent                                          A 1/4'" gap for the galley hinge
I notched the hinge to allow for the edge of the galley lid.
I screwed the hinge to the maple spar with stainless screws. I used caulk tape as a sealant.

Extreme weather stripping is used around the door.
All of the splices in the wiring are soldered, covered in shrink tube. No wire-nuts are used.
All of the wiring for the running lights as well as the cabin, is in the frame tubing.



Some shots of the finished project!
Mike took it home to do the varnish and other finishing.









Contents and images, Copyright, 2002-2006, Steve Frederick
Design ans photo-realistics renderings, Copyright, Mike Schneider
No image or text may be reproduced for any commercial use without permission.
Updated July 14,2006


Back Home  "Lil Diner 2